iii
Contents
1.
Before Installation
1
Electrical Supply Considerations
1
Environmental Considerations
1
Dimensions
2
Airflow Consideration when Mounting in the Equipment Frame
2
Mechanical Considerations when Mounting in the Equipment Frame
6
Mounting Requirements
6
2.
Hardware Installation
9
Unshipping and Mounting the System
9
Mounting Flanges
13
19-inch Mountings
13
23-inch, 24-inch and 600mm Mountings
18
Cable Bracket Assemblies
22
Removing and Installing Modules
23
Module Injector/Ejector Mechanisms
23
Replacing an RMM
30
Replacing a Disk Chassis
32
Flexible Module Cabling
35
Содержание Netra ft 1800
Страница 6: ...vi Netra ft 1800 Installation Guide February 1999 ...
Страница 10: ...x Netra ft 1800 Installation Guide February 1999 ...
Страница 40: ...26 Netra ft 1800 Installation Guide February 1999 FIGURE 2 12 Removing a CPUset Module ...
Страница 41: ...Chapter 2 Hardware Installation 27 CAF Modules FIGURE 2 13 Removing a CAF ...
Страница 42: ...28 Netra ft 1800 Installation Guide February 1999 PCI Modules FIGURE 2 14 Removing a PCI Card Carrier ...
Страница 43: ...Chapter 2 Hardware Installation 29 PSU Modules FIGURE 2 15 Removing a Power Supply ...
Страница 45: ...Chapter 2 Hardware Installation 31 FIGURE 2 16 Removing an RMM Module ...
Страница 56: ...42 Netra ft 1800 Installation Guide February 1999 ...
Страница 90: ...76 Netra ft 1800 Installation Guide February 1999 W weight empty chassis 6 maximum 2 removable modules 6 ...