32
Netra 240 Server Service Manual
• June
2004
4. Power on the server.
See
“Powering On the Server” on page
Avoiding Electrostatic Discharge
Whenever you work with the server’s internal components, follow this procedure to
prevent damage caused by static electricity.
You need the following items:
■
Antistatic wrist or foot strap
■
Antistatic mat
1. Power off the system.
See
“Powering Off the Server” on page
2. Remove the server cover.
See
“Removing the Server Cover” on page
3. Attach one end of the antistatic strap to the grounding point inside the server, and
the other end to your wrist (
FIGURE
2-8
Grounding Point in the Server
Grounding point in server
Содержание Netra 240
Страница 7: ...Contents vii Index 133...
Страница 8: ...viii Netra 240 Server Service Manual June 2004...
Страница 12: ...xii Netra 240 Server Service Manual June 2004...
Страница 70: ...52 Netra 240 Server Service Manual June 2004...
Страница 84: ...66 Netra 240 Server Service Manual June 2004...
Страница 120: ...102 Netra 240 Server Service Manual June 2004...
Страница 124: ...106 Netra 240 Server Service Manual June 2004...
Страница 132: ...114 Netra 240 Server Service Manual June 2004...