background image

6

Sun  Fire V125 Server Installation Guide • September 2006

Perform the procedures in this chapter, in the order they are listed, to install your
server into a 4-post rack using the slide rails. These slide rails are compatible with a
wide range of equipment racks that meet the following standards:

4-post structure (mounting at both front and rear). 2-post racks are not
compatible.

Rack horizontal opening and unit vertical pitch conforming to ANSI/EIA 310-D-
1992 or IEC 60927 standards.

Distance between front and rear mounting planes between 610 mm and 915 mm
(24 inches to 36 inches).

Clearance depth (to front cabinet door) in front of front rackmounting plane at
least 25.4 mm (1 inch).

Clearance depth (to rear cabinet door) behind front rackmounting plane at least
800 mm (31.5 inches), or 700 mm (27.5 inches).

Clearance width (between structural supports and cable troughs) between front
and back mounting planes at least 456 mm (18 inches).

Caution –

Always load equipment into a rack from the bottom up so that it will not

become top heavy and tip over. Deploy the antitilt bar to prevent the rack from
tipping during equipment installation.

Installing the Slide Rails

The procedures in this section contain instructions to install the slide rail assemblies
to the rack and then the server chassis, with mounting brackets, into the slide rail
assemblies that are mounted to the rack.

To Disassemble the Slide Rails

1. Unpack the slide rails.

2. Locate the slide rail lock at the front of one of the slide rail assemblies, as shown

in

FIGURE 2-1

.

3. Squeeze and hold the tabs at the top and bottom of the lock while you pull the

mounting bracket out of the slide rail assembly, until it reaches the stop.

See

FIGURE 2-1

.

Содержание Fire V125

Страница 1: ...Sun Microsystems Inc www sun com Submit comments about this document at http www sun com hwdocs feedback Sun Fire V125 Server Installation Guide Part No 819 7422 10 September 2006 Revision A...

Страница 2: ...VALID Copyright 2006 Sun Microsystems Inc 4150 Network Circle Santa Clara Californie 95054 Etats Unis Tous droits r serv s Sun Microsystems Inc a les droits de propri t intellectuels relatants la tech...

Страница 3: ...ackmounting Kit Contents 5 Compatible Racks 5 Installing the Slide Rails 6 To Disassemble the Slide Rails 6 To Install the Mounting Brackets Onto the Server 7 To Attach the Slide Rail Assemblies to th...

Страница 4: ...d at a Name Server 14 To Configure Without the Server s Details Registered at a Name Server 14 To Configure a Standalone Server for the First Time 15 Clearing Your Configuration 16 To Clear the Config...

Страница 5: ...2 1 Disassembling the Slide Rail Before Installation 7 FIGURE 2 2 Slide Rail Assembly Mounting to Rack Post 8 FIGURE 2 3 Inserting the Server With Mounting Brackets Into the Slide Rails 9 FIGURE 2 4 S...

Страница 6: ...vi Sun Fire V125 Server Installation Guide September 2006...

Страница 7: ...our site for the installation and read the latest product notes See these documents before you begin the installation process Sun Fire V125 Server Getting Started Guide Sun Fire V125 Server Product No...

Страница 8: ...ns for mounting the server into the rack Chapter 3 contains an overview of the status indicators and instructions for powering on the server connecting a console and configuring the preinstalled softw...

Страница 9: ...c123 The names of commands files and directories on screen computer output Edit your login file Use ls a to list all files You have mail AaBbCc123 What you type when contrasted with on screen computer...

Страница 10: ...stration Sun Fire V125 Server Administration Guide 819 7420 PDF and HTML Online Service Sun Fire V125 Server Service Manual 819 7421 PDF and HTML Online Safety and Compliance Sun Fire V125 Server Safe...

Страница 11: ...used by or in connection with the use of or reliance on any such content goods or services that are available on or through such sites or resources Sun Welcomes Your Comments Sun is interested in impr...

Страница 12: ...xii Sun Fire V125 Server Installation Guide September 2006...

Страница 13: ...the appropriate instructions that you must complete Each step must be completed in order 1 Prepare the site for the power clearance and environmental requirements If you are installing the server int...

Страница 14: ...on page 11 6 Set the desired OpenBoot PROM configuration options The initial boot will test the entire system You can change the level of testing by using the OpenBoot PROM commands and configuration...

Страница 15: ...ction using the SERIAL MGT port or an Ethernet connection using the NET MGT port Note The ALOM serial port labelled SERIAL MGT is for server management only If you need a general purpose serial port u...

Страница 16: ...4 Sun Fire V125 Server Installation Guide September 2006...

Страница 17: ...unting Kit Contents on page 5 Compatible Racks on page 5 Installing the Slide Rails on page 6 Rackmounting Kit Contents The rackmount kit consists of the following components Slide assemblies Spacer t...

Страница 18: ...e at least 800 mm 31 5 inches or 700 mm 27 5 inches Clearance width between structural supports and cable troughs between front and back mounting planes at least 456 mm 18 inches Caution Always load e...

Страница 19: ...assembling the Slide Rail Before Installation To Install the Mounting Brackets Onto the Server 1 Position a mounting bracket against the chassis so that the slide rail lock is at the server front and...

Страница 20: ...d used to attach the slide rails varies depending on the type of rack If your rack has threaded mounting holes in the rack posts determine whether the threads are metric or standard then insert the co...

Страница 21: ...slide rails into the slide rail assemblies as far as possible 2 Raise the server so that the rear ends of the mounting brackets are aligned with the slide rail assemblies that are mounted in the equip...

Страница 22: ...ile you push the server into the rack see FIGURE 2 3 FIGURE 2 4 Slide Rail Lock 5 Continue pushing until the slide rail locks on the front of the mounting brackets engage the slide rail assemblies Cau...

Страница 23: ...dicators Before you power on the server you should become familiar with the LED indicators associated with the server itself and with various components The server status indicators are located on the...

Страница 24: ...execute certain commands 3 If you are prompted to do so set a password for the admin user The password must Contain at least two alphabetic characters Contain at least one numeric or one special char...

Страница 25: ...he first time a series of questions leads you through the configuration procedure This procedure consists of a number of questions The answers you give determine how the server is configured In OpenBo...

Страница 26: ...ecurity mechanism and then follow the instructions on the screen 4 When prompted give a password if any for users logging in as the superuser To Configure Without the Server s Details Registered at a...

Страница 27: ...the network for a name server or whether you want it to use a particular name server 12 If you chose to use a particular name server specify the host name and IP address of the name server 13 At the n...

Страница 28: ...at a Name Server on page 14 To Configure Without the Server s Details Registered at a Name Server on page 14 To Configure a Standalone Server for the First Time on page 15 Accessing the Sun Advanced L...

Страница 29: ...ust Contain at least two alphabetic characters Contain at least one numeric or one special character Be at least six characters long After you set the password the admin user has full permissions and...

Страница 30: ...18 Sun Fire V125 Server Installation Guide September 2006...

Отзывы: