![Stulz CeilAiR Series Скачать руководство пользователя страница 16](http://html1.mh-extra.com/html/stulz/ceilair-series/ceilair-series_installation-operation-and-maintenance-manual_1387310016.webp)
(Mar, 2012)
CeilAiR OHS Series Installation, Operation & Maintenance Manual
Air Technology Systems, Inc.
2-5
CAUTION
The probes must not touch the mounting sur-
face. Failure to adhere to this may result in
improper operation of equipment.
2.4.5.4 Cable Type Water Detector
Lay the cable water detector across the surface
where water could
collect. When water is
present, current will
fl ow between the two
wires.
2.5 Air Distribution Connection
2.5.1 Spot Cooler (See Figure 2)
For units that are not ducted, the air conditioner should
be mounted above the ceiling grid, leaving suffi cient
space for the air grilles to rest on the ceiling T-bar.
NOTE
Placement of the grilles is important. The
hinged fi lter grille goes on the return air side
of the unit. The 3-way directional grille goes
on the conditioned air discharge side of the air
conditioner. Gasketing is factory supplied for
an air seal between the bottom fl ange of the air
conditioner and the grille. After mounting the air
conditioner, lower the air conditioner until the
gasket meets the grille.
Figure 2- Spot Cooler Grille
Содержание CeilAiR Series
Страница 1: ... Mar 2012 CeilAiR OHS Series Installation Operation Maintenance Manual Air Technology Systems Inc ...
Страница 54: ... Mar 2012 CeilAiR OHS Series Installation Operation Maintenance Manual Air Technology Systems Inc NOTES ...
Страница 56: ... Mar 2012 CeilAiR OHS Series Installation Operation Maintenance Manual Air Technology Systems Inc ...
Страница 58: ... Mar 2012 CeilAiR OHS Series Installation Operation Maintenance Manual Air Technology Systems Inc ...