
AC Power Service Requirements
4-4
Stratus ftServer 3300, 5600, and 6600: Site Planning Guide (R553)
Use the following worksheets to determine AC power requirements for the site.
•
In
, determine the power requirements at the A-side power source.
•
In
, determine the power requirements at the B-side power source.
•
In
, determine the power requirements for components outside of the
cabinet. These components can share a power source with the A-side or B-side
components.
The power service must be properly wired and grounded according to local standards
and regulations. See
for electrical circuit and wiring information.
To determine power receptacle requirements
1. In the Quantity column, write the number of each type of component.
2. Multiply the entry in the Quantity column by the number in the @ Power (Watts)
column, and enter the result in the AC Power (Extended) column.
3. Add the values in the AC Power (Extended) column, and enter the sum on the
bottom line. This value indicates the maximum power requirement for each power
source.
Table 4-5. Worksheet for Determining A-Side Power Requirements
System Component
Quantity
@ Power
(Watts)
AC Power
(Extended)
ftServer 6600 system
x
1300
=
ftServer 5600 system
x
650
=
ftServer 3300 system
x
500
=
x
300
=
x
21
=
x
20
=
T521 and T522 tape drive
enclosure
x
500
TOTAL A-SIDE POWER REQUIREMENTS
Содержание ftserver 3300
Страница 1: ...Stratus Technologies R553 01 Stratus ftServer 3300 5600 and 6600 Site Planning Guide...
Страница 10: ...Tables x Stratus ftServer 3300 5600 and 6600 Site Planning Guide R553 Table D 4 Noise Standards D 2...
Страница 14: ...Preface xiv Stratus ftServer 3300 5600 and 6600 Site Planning Guide R553...
Страница 24: ...System Documentation 1 10 Stratus ftServer 3300 5600 and 6600 Site Planning Guide R553...
Страница 32: ...Planning for Cables 3 4 Stratus ftServer 3300 5600 and 6600 Site Planning Guide R553...
Страница 50: ...Stratus Supplied Power Cords 4 18 Stratus ftServer 3300 5600 and 6600 Site Planning Guide R553...
Страница 62: ...Connecting ftServer Systems Directly to a UPS 5 12 Stratus ftServer 3300 5600 and 6600 Site Planning Guide R553...
Страница 100: ...Rack Mountable ftServer 3300 System Specifications A 16 Stratus ftServer 3300 5600 and 6600 Site Planning Guide R553...
Страница 133: ...Standards Compliance Standards Compliance D 3 VCCI Note BSMI Note...
Страница 134: ...Standards Compliance D 4 Stratus ftServer 3300 5600 and 6600 Site Planning Guide R553...
Страница 138: ...Index Index 4 Stratus ftServer 3300 5600 and 6600 Site Planning Guide R553...