![Stratus ftserver 3300 Скачать руководство пользователя страница 26](http://html1.mh-extra.com/html/stratus/ftserver-3300/ftserver-3300_site-planning-manual_1383767026.webp)
Rack Requirements
2-2
Stratus ftServer 3300, 5600, and 6600: Site Planning Guide (R553)
•
The cabinet provides enough stability so that system components pass Telcordia
GR-63-CORE Section 5.4.2 regulations for operational vibration.
•
To prevent stray voltages, all components are grounded together through the
vertical mounting rails to the cabinet frame, and then to ground and also to local
building ground. To ensure signal quality, use a grounding cable provided by
Stratus for local building ground.
•
There is a plan for maintaining cables and wires to the cabinet by either running
them under the floor or placing them overhead in a power bus.
•
Air flows through the cabinet from front to back.
•
Air does not recirculate within the cabinet.
•
Filler panels cover any unused rack space to prevent air recirculation.
•
Vents are evenly distributed on the front and rear doors and comprise at least 63%
of the surface area.
N O T E
If your cabinet does not have vented front and rear doors,
you can remove the doors from the cabinet while the
ftServer system is operating.
Additional Cabinet Requirements for ftServer 6600 Systems
Make sure that:
•
A 24U cabinet can support at least 900 lb (410 kg) to support
•
A 38U cabinet can support at least 1100.00 lb (500 kg) to support allowed
configurations and components for a 38U cabinet.
•
The distance between the front and rear vertical rails is 27 in. (68.58 cm).
•
The vertical mounting rails accept 10/32 screws.
Additional Cabinet Requirements for ftServer 3300 and 5600 Systems
Make sure that:
•
The distance between the front and rear vertical rails is between 25 in. and 30 in.
(63.50 cm and 76.20 cm).
•
The vertical mounting rails accept M-5 cage nuts and mounting hardware.
Содержание ftserver 3300
Страница 1: ...Stratus Technologies R553 01 Stratus ftServer 3300 5600 and 6600 Site Planning Guide...
Страница 10: ...Tables x Stratus ftServer 3300 5600 and 6600 Site Planning Guide R553 Table D 4 Noise Standards D 2...
Страница 14: ...Preface xiv Stratus ftServer 3300 5600 and 6600 Site Planning Guide R553...
Страница 24: ...System Documentation 1 10 Stratus ftServer 3300 5600 and 6600 Site Planning Guide R553...
Страница 32: ...Planning for Cables 3 4 Stratus ftServer 3300 5600 and 6600 Site Planning Guide R553...
Страница 50: ...Stratus Supplied Power Cords 4 18 Stratus ftServer 3300 5600 and 6600 Site Planning Guide R553...
Страница 62: ...Connecting ftServer Systems Directly to a UPS 5 12 Stratus ftServer 3300 5600 and 6600 Site Planning Guide R553...
Страница 100: ...Rack Mountable ftServer 3300 System Specifications A 16 Stratus ftServer 3300 5600 and 6600 Site Planning Guide R553...
Страница 133: ...Standards Compliance Standards Compliance D 3 VCCI Note BSMI Note...
Страница 134: ...Standards Compliance D 4 Stratus ftServer 3300 5600 and 6600 Site Planning Guide R553...
Страница 138: ...Index Index 4 Stratus ftServer 3300 5600 and 6600 Site Planning Guide R553...