70
FP10 Lafayette - Installation and Operation Manual
3.
Secure the ducting (A) to the 90° elbows (E) with self-tapping screws (3 per elbow). Insert the hot air
outlets (F) in the elbow (E). Set hot air outlets frames behind the non-combustible materiel and secure
to the wall with screws. Secure hot air outlets (F) to the elbows (E) with 3 self-tapping screws each.
Secure the hot air outlets grilles to the frames with screws.
4.
Maintain at least a 2" (50 mm) clearance between the ducts and the firestop; the required hole size for
the hot air grilles (outlet) is 8¼" × 8¼" (210 mm × 210 mm).
5.
The maximum number of elbows in a run of duct is two.
6.
Maintain at least 10" (254 mm) clearance from the outlet grille framing to a combustible ceiling, side
wall or mantel.
Содержание Valcourt FP10 Lafayette
Страница 10: ...10 FP10 Lafayette Installation and Operation Manual...
Страница 11: ...FP10 Lafayette Installation and Operation Manual 11...
Страница 12: ...12 FP10 Lafayette Installation and Operation Manual...
Страница 38: ...38 FP10 Lafayette Installation and Operation Manual...
Страница 57: ...FP10 Lafayette Installation and Operation Manual 57 Direct installation Exterior offset installation...
Страница 92: ...92 FP10 Lafayette Installation and Operation Manual APPENDIX 7 EXPLODED DIAGRAM AND PARTS LIST...