FP10 Lafayette - Installation and Operation Manual
47
CLEARANCES
M*
53 1/2" (1359 mm)
N*
75 1/2" (1918 mm)
*When drywall panels or any other finishing material inside the chase around the fireplace is to be used,
add its thickness to the measurement.
**Values M and N are minimum measurements. They may need to be increased to alloy installation of a
Fresh air intake kit or forced air distribution kit, or depending on the finish material used.
CLEARANCES
A
3" (76 mm) maximum
B
5 5/8" (143 mm) minimum
C
24" (610 mm) minimum
Содержание Valcourt FP10 Lafayette
Страница 10: ...10 FP10 Lafayette Installation and Operation Manual...
Страница 11: ...FP10 Lafayette Installation and Operation Manual 11...
Страница 12: ...12 FP10 Lafayette Installation and Operation Manual...
Страница 38: ...38 FP10 Lafayette Installation and Operation Manual...
Страница 57: ...FP10 Lafayette Installation and Operation Manual 57 Direct installation Exterior offset installation...
Страница 92: ...92 FP10 Lafayette Installation and Operation Manual APPENDIX 7 EXPLODED DIAGRAM AND PARTS LIST...