Operation
5
Hydraulic system
– Turn the ring on the connector sleeve (A)
until the two markings on the coupling are
aligned (B).
– Press the ring on the connector sleeve in
the direction of the ball (B) and disconnect
the plug connector (C).
NOTE
The ball on the coupling must lie in the groove
on the connector sleeve!
NOTE
Appearance of the guard plate on the hydraulic
coupling may vary slightly from the figure.
50988046101 EN - 02/2017
55
Содержание LiftRunner B frames
Страница 1: ...Original instructions Liftrunner B frames for tugger trains 50988046101 EN 02 2017 ...
Страница 2: ......
Страница 6: ......
Страница 7: ...1 Foreword ...
Страница 14: ...1 Foreword Environmental considerations 8 50988046101 EN 02 2017 ...
Страница 15: ...2 Introduction ...
Страница 20: ...2 Introduction Residual risk 14 50988046101 EN 02 2017 ...
Страница 21: ...3 Safety ...
Страница 28: ...3 Safety Safety regulations for handling consumables 22 50988046101 EN 02 2017 ...
Страница 29: ...4 Overviews ...
Страница 45: ...Overviews 4 Labelling points Position Position of the identification plate 50988046101 EN 02 2017 39 ...
Страница 53: ...5 Operation ...
Страница 88: ...5 Operation Roadways 82 50988046101 EN 02 2017 ...
Страница 90: ...5 Operation Roadways For 180 curves depending on the length of the train 84 50988046101 EN 02 2017 ...
Страница 91: ...Operation 5 Roadways 50988046101 EN 02 2017 85 ...
Страница 93: ...6 Maintenance ...
Страница 99: ...7 Technical data ...
Страница 104: ...7 Technical data B frames triple loadable 98 50988046101 EN 02 2017 ...
Страница 107: ......
Страница 108: ...STILL GmbH 50988046101 EN 02 2017 ...