Operation
5
Assembling the articulated steering system
– Insert the hinged tiller on the second
articulated frame steering rig into the towing
jaws of the compensating hinge.
– Insert the coupling pin and lock it in place.
The illustration shows the hinged tiller with the
compensating hinge between two articulated
frame steering rigs.
The figure shows the hinged tiller when
loading and unloading is performed on the
left-hand side in the drive direction.
Removing
– Unlock the coupling pin for the compensat-
ing hinge and pull out the hinged tiller of the
rear articulated frame steering rig from the
towing jaws of the compensating hinge.
50988046101 EN - 02/2017
75
Содержание LiftRunner B frames
Страница 1: ...Original instructions Liftrunner B frames for tugger trains 50988046101 EN 02 2017 ...
Страница 2: ......
Страница 6: ......
Страница 7: ...1 Foreword ...
Страница 14: ...1 Foreword Environmental considerations 8 50988046101 EN 02 2017 ...
Страница 15: ...2 Introduction ...
Страница 20: ...2 Introduction Residual risk 14 50988046101 EN 02 2017 ...
Страница 21: ...3 Safety ...
Страница 28: ...3 Safety Safety regulations for handling consumables 22 50988046101 EN 02 2017 ...
Страница 29: ...4 Overviews ...
Страница 45: ...Overviews 4 Labelling points Position Position of the identification plate 50988046101 EN 02 2017 39 ...
Страница 53: ...5 Operation ...
Страница 88: ...5 Operation Roadways 82 50988046101 EN 02 2017 ...
Страница 90: ...5 Operation Roadways For 180 curves depending on the length of the train 84 50988046101 EN 02 2017 ...
Страница 91: ...Operation 5 Roadways 50988046101 EN 02 2017 85 ...
Страница 93: ...6 Maintenance ...
Страница 99: ...7 Technical data ...
Страница 104: ...7 Technical data B frames triple loadable 98 50988046101 EN 02 2017 ...
Страница 107: ......
Страница 108: ...STILL GmbH 50988046101 EN 02 2017 ...