Propeller Adjustment Report
Design Organ. No. EB 11
Product. Organ. No. I - B 40
GmbH & Co. KG
Typ: STEMME 10AP-V und 11AP-V
Page 1 (of 2)
prepared:
Sign
checked:
Sign
Date:
supersedes issue:
Dube
Montag
08.10.1999
Serial No. of Propeller:
Installed to Serial No.:
Registration:
Order No.:
Drawing Up Reason:
Conformity Inspection
Repair and Inspection. Date of Finding Report: ___________________________________
Other: ___________________________________________________________________
No.
Item or Inspection to be Performed / Inspection Results
Performed
Checke
d
1. Center of Gravity [mm / in.]*, Mass [g / dr.] and Radial Mass-Moment [g mm / dr. in.]:
2. Needle Bearings:
Inner Rings and Needles
3. Balance Weight Washers
[Number and Type]:
*Units, general: Delete as applicable
m [g/ dr.] z [mm/in.] J
z
[g mm / dr.in.] x [mm / in.] y [mm / in.]
Propeller Blade 1:
blank
1 AP-VB/...../....
finished
Propeller Blade 2:
blank
1 AP-VB/______/___
finished
Blade No. 2 was marked red and installed on the corresponding side.
Pos: Number
Part.-No.
Weight (sum) g / dr.
A:
B:
C:
D:
E:
F:
G:
H:
J:
K:
Part.-No.
Inner Ring
Needles
Inner Ring
Needles
Blade No. 1
Blade No. 2
“red“ side
Hub No.:
“Red“ Side
Fork No.2:
Fork No.1: