b. Hook the monitoring unit first onto the upper rail and
then onto the lower rail.
c. Slide the monitoring unit towards the left as far as it
will go until it lies adjacent to the (rightmost mount-
ed) inverter . The AC connection and data connection
must latch into place on both units.
d. Slide the fastening clip upwards once more The moni-
toring unit is now mounted.
7.2
Wiring the AC plug
The grid feed cable is connected via the AC plug to the
grid
feed AC output
connection (
The AC plug is supplied with the unit. Information on the pin
assignments us provided on the plug.