I N S T A L L A T I O N
steamOsorb installation
Condensate return
Bottom bracket
SOS-R vertical
steam ramps
Top bracket
SOS-H header
Air
Air
Figure 29 – steamOsorb mul ramp installa on
90°
Figure 30 steam ramp profile and outlets posi on
Please refer to steamOsorb IOM for installa on guidelines.
26
A
ir