March 13, 2014
7
922-135 3’ TRANSFER STATION
INSTALLATION INSTRUCTION
INSTALLATION STEPS CONTINUED
__6)
Install Handrails And Inside step Legs:
You
will need both
the Left (8) and Right (9) Handrails, two Inside Step Legs, four
3/8”x 2 ½” Button Head Bolts, eight 3/8” Flat Washers, four 3/8”
Locknuts, two Four Hole Attachment Brackets (15), two Gaskets
for Attachment Brackets (16), eight Self tapping Screws (17), and
two 3/8”x 3/8” Set screws. Place one 3/8” Flat Washer on to each
of the 2 ½”Button Head Bolts. Insert this through the bottom hole
on the Handrail, then through the bottom hole in the side of the
stair. Now place the step leg into the footing hole and onto the
3/8”x 2 1/2” Button Head Bolt, the flat side of the inside step leg
should touch the inside of the Transfer Station Stairs. Secure this
with a second 3/8” Flat Washer and 3/8” Locknut. (See detail B)
Install a second 3/8”x 2” Button Head Bolt and 3/8” Flat washer
into the top hole of the Handrail. Place one of the Four Hole
Attachment Brackets on the bent end of the Handrail and mark the
holes on the post that it connects to. Drill the holes and install the
Four Hole Attachment Bracket to the post. With the hole in the
Four Hole Attachment Bracket facing the ground, attach it to the
post using four Self tapping Screws, the Attachment Bracket
Gasket will install between the Bracket and the post. Now you
need to install the 3/8” x 3/8” set screw into the threaded insert in
the Four Hole Attachment bracket to secure the Handrail to the
post. (See detail C) Repeat this for the other handrail.
Содержание Quick Ship 3 Modified
Страница 1: ... 012 3 4 5 2 6 7 8 9 8 6 0 5 4 72 2ABCDB EBCF GHB BIGJEB KCILCA MBNOEB MBPJIIJIP JIDGCAACGJOI ...
Страница 2: ......
Страница 4: ......
Страница 6: ......
Страница 7: ...QUICK SHIP 3 MODIFIED Installation Guide ...
Страница 8: ......
Страница 10: ......
Страница 12: ......
Страница 14: ......
Страница 21: ...Value Series Installation Guide 2 28 11 V C_OUTLINE V1 0211 14 Installation Punch List Footing Layout Example ...
Страница 29: ......
Страница 30: ...Value Series Installation Guide 2 28 11 V C_OUTLINE V1 0211 22 COMPONENT INSTALLATION INSTRUCTIONS ...
Страница 31: ......
Страница 34: ...March 10 2014 3 912 242 SQUARE DECK 46 INSTALLATION INSTRUCTION ...
Страница 41: ...March 13 2014 4 922 135 3 TRANSFER STATION INSTALLATION INSTRUCTION ...
Страница 51: ...March 11 2014 4 922 120 3 CORKSCREW 3 DECK INSTALLATION INSTRUCTION ...
Страница 59: ...March 10 2014 4 922 126 3 3 TRIPLE RAIL SLIDE INSTALLATION INSTRUCTION ...
Страница 67: ...March 13 2014 4 922 127 3 3 DOUBLE WALL STRAIGHT SLIDE INSTALLATION INSTRUCTION ELEVATION AND FOOTING LAYOUT ...
Страница 75: ...February 17 2010 4 912 807 SAND WATER PANEL INSTALLATION INSTRUCTION ...
Страница 85: ...May 1 2014 6 922 112 BUBBLE WINDOW INSTALLATION INSTRUCTION THIS PAGE WAS INTENTIONALLY LEFT BLANK ...
Страница 103: ...April 30 2014 6 912 275 PYRAMID ROOF INSTALLATION INSTRUCTION THIS PAGE WAS INTENTIONALLY LEFT BLANK ...
Страница 104: ...VALUE SERIES INSTALLATION APPENDIX 4 2 10 M C_APPENDIX V1 0410 1 INSTALLATION APPENDIX ...
Страница 105: ......
Страница 110: ...VALUE SERIES INSTALLATION APPENDIX 4 2 10 M C_APPENDIX V1 0410 6 ORIGINAL INSPECTION AND MAINTENANCE FORMS ...
Страница 111: ......
Страница 140: ...VALUE SERIES INSTALLATION APPENDIX 4 2 10 M C_APPENDIX V1 0410 8 COMPLETED INSPECTION AND MAINTENANCE FORMS ...