FINAL INSTALLATION STEPS
__1. Once the entire playground has been assembled level and
square each post, deck and component.
__2. Tighten all hardware.
__3. Starting at the center of the structure and working out
towards the perimeter of the structure, pour concrete into
footing holes. Leave 2” from the top of the hole to the top of
the concrete to allow for backfill. Slope concrete down and
away from post to water from seeping between the post and the
concrete. Refer to the footing sections in the individual
component instructions for a cutaway drawing.
__4. Clean off any concrete that may have splashed onto
equipment before it dries.
__5. After the concrete has set for a minimum of 48 hours
(refer to manufacturers instructions for proper cure time) you
should backfill the holes. Also, remove any concrete that is not
in the holes so they don’t become a hazard for children.
__6. Install labels as instructed on the next page.
__7. Install Surfacing. A protective surfacing material is
required under and around all play equipment within the use
zone. If using loose fill surfacing, we recommend a depth of
12” for the entire use zone.
Loose fill surfacing material must be maintained at the required
depth within the use zone. Loose fill material must be replaced
or added as necessary to maintain its resilient properties.
Содержание Quick Ship 3 Modified
Страница 1: ... 012 3 4 5 2 6 7 8 9 8 6 0 5 4 72 2ABCDB EBCF GHB BIGJEB KCILCA MBNOEB MBPJIIJIP JIDGCAACGJOI ...
Страница 2: ......
Страница 4: ......
Страница 6: ......
Страница 7: ...QUICK SHIP 3 MODIFIED Installation Guide ...
Страница 8: ......
Страница 10: ......
Страница 12: ......
Страница 14: ......
Страница 21: ...Value Series Installation Guide 2 28 11 V C_OUTLINE V1 0211 14 Installation Punch List Footing Layout Example ...
Страница 29: ......
Страница 30: ...Value Series Installation Guide 2 28 11 V C_OUTLINE V1 0211 22 COMPONENT INSTALLATION INSTRUCTIONS ...
Страница 31: ......
Страница 34: ...March 10 2014 3 912 242 SQUARE DECK 46 INSTALLATION INSTRUCTION ...
Страница 41: ...March 13 2014 4 922 135 3 TRANSFER STATION INSTALLATION INSTRUCTION ...
Страница 51: ...March 11 2014 4 922 120 3 CORKSCREW 3 DECK INSTALLATION INSTRUCTION ...
Страница 59: ...March 10 2014 4 922 126 3 3 TRIPLE RAIL SLIDE INSTALLATION INSTRUCTION ...
Страница 67: ...March 13 2014 4 922 127 3 3 DOUBLE WALL STRAIGHT SLIDE INSTALLATION INSTRUCTION ELEVATION AND FOOTING LAYOUT ...
Страница 75: ...February 17 2010 4 912 807 SAND WATER PANEL INSTALLATION INSTRUCTION ...
Страница 85: ...May 1 2014 6 922 112 BUBBLE WINDOW INSTALLATION INSTRUCTION THIS PAGE WAS INTENTIONALLY LEFT BLANK ...
Страница 103: ...April 30 2014 6 912 275 PYRAMID ROOF INSTALLATION INSTRUCTION THIS PAGE WAS INTENTIONALLY LEFT BLANK ...
Страница 104: ...VALUE SERIES INSTALLATION APPENDIX 4 2 10 M C_APPENDIX V1 0410 1 INSTALLATION APPENDIX ...
Страница 105: ......
Страница 110: ...VALUE SERIES INSTALLATION APPENDIX 4 2 10 M C_APPENDIX V1 0410 6 ORIGINAL INSPECTION AND MAINTENANCE FORMS ...
Страница 111: ......
Страница 140: ...VALUE SERIES INSTALLATION APPENDIX 4 2 10 M C_APPENDIX V1 0410 8 COMPLETED INSPECTION AND MAINTENANCE FORMS ...