922-120-3 CORKSCREW 3’ DECK
INSTALLATION INSTRUCTION
SPECIFICATIONS
Paint – Electrostatically applied & oven cured powder coat
Hardware – Stainless steel & tamper resistant
Tube – FloCoat® Galvanized 1 3/8” OD and 1” OD.
Attachment Bracket – Powder coated cast aluminum
Corkscrew Climber–1 7/8” O.D. tube with 1 3/8 O.D. rolled
tube welded to 1 7/8” tube
Arch Wall-1 7/8”, 1 3/8”, and 1” O.D. tube MIG welded
together
INSTALLATION TIPS & TROUBLE SHOOTING
SportsPlay Equipment Inc. recommends pre-drilling the
holes in the post when attaching a four-hole bracket with a
number #7 drill bit. This will make the attachment of the
four-hole bracket with the self-tapping screws easier and it
will prevent damage to the screw head during installation.
Apply locktite to all bolts during assembly prior to
completely tightening them.
Stainless Steel hardware can occasionally be difficult to use
particularly if you need to take them out to make an
adjustment. It is recommended that you add a drop of oil to
bolts that may have to be removed before you install them.
Do not tighten bolts all the way until the unit is completely
assembled and all components are square and level.
Identify and separate all parts by referencing the detail
drawings and the parts list.
As you unpack and separate the components use the
cardboard sheets that were used for packing and shipping to
prevent damage to the components. This is particularly true
all Powder Coated and Thermoplastic coated components,
by setting the components on top of the cardboard.
Содержание Quick Ship 3 Modified
Страница 1: ... 012 3 4 5 2 6 7 8 9 8 6 0 5 4 72 2ABCDB EBCF GHB BIGJEB KCILCA MBNOEB MBPJIIJIP JIDGCAACGJOI ...
Страница 2: ......
Страница 4: ......
Страница 6: ......
Страница 7: ...QUICK SHIP 3 MODIFIED Installation Guide ...
Страница 8: ......
Страница 10: ......
Страница 12: ......
Страница 14: ......
Страница 21: ...Value Series Installation Guide 2 28 11 V C_OUTLINE V1 0211 14 Installation Punch List Footing Layout Example ...
Страница 29: ......
Страница 30: ...Value Series Installation Guide 2 28 11 V C_OUTLINE V1 0211 22 COMPONENT INSTALLATION INSTRUCTIONS ...
Страница 31: ......
Страница 34: ...March 10 2014 3 912 242 SQUARE DECK 46 INSTALLATION INSTRUCTION ...
Страница 41: ...March 13 2014 4 922 135 3 TRANSFER STATION INSTALLATION INSTRUCTION ...
Страница 51: ...March 11 2014 4 922 120 3 CORKSCREW 3 DECK INSTALLATION INSTRUCTION ...
Страница 59: ...March 10 2014 4 922 126 3 3 TRIPLE RAIL SLIDE INSTALLATION INSTRUCTION ...
Страница 67: ...March 13 2014 4 922 127 3 3 DOUBLE WALL STRAIGHT SLIDE INSTALLATION INSTRUCTION ELEVATION AND FOOTING LAYOUT ...
Страница 75: ...February 17 2010 4 912 807 SAND WATER PANEL INSTALLATION INSTRUCTION ...
Страница 85: ...May 1 2014 6 922 112 BUBBLE WINDOW INSTALLATION INSTRUCTION THIS PAGE WAS INTENTIONALLY LEFT BLANK ...
Страница 103: ...April 30 2014 6 912 275 PYRAMID ROOF INSTALLATION INSTRUCTION THIS PAGE WAS INTENTIONALLY LEFT BLANK ...
Страница 104: ...VALUE SERIES INSTALLATION APPENDIX 4 2 10 M C_APPENDIX V1 0410 1 INSTALLATION APPENDIX ...
Страница 105: ......
Страница 110: ...VALUE SERIES INSTALLATION APPENDIX 4 2 10 M C_APPENDIX V1 0410 6 ORIGINAL INSPECTION AND MAINTENANCE FORMS ...
Страница 111: ......
Страница 140: ...VALUE SERIES INSTALLATION APPENDIX 4 2 10 M C_APPENDIX V1 0410 8 COMPLETED INSPECTION AND MAINTENANCE FORMS ...