Value Series
Installation Guide
2/28/11 V-C_OUTLINE.V1.0211
16
4.
It is recommended that you use a transit to level the remaining postholes
to the first hole in order to ensure that the posts are level.
5.
Using the post identification drawing (4
th
page of this booklet) identify
which post goes in each hole by matching the number on the post with
the number on the drawing.
Step 3: Deck, Post & Component Installation
1.
The easiest way to install the playground is by starting with the central
deck and then work out. We recommend installing the posts and central
deck and once the post and deck are square and level you may add the
concrete (concrete with a minimum of 2,500 psi should be used). Mix
concrete per manufacturers instructions and let it cure for at least 24
hours before continuing.
2.
NEVER LEAVE THE INSTALLATION SITE UNATTENDED
WITHOUT ROPING OFF THE AREA AND EQUIPMENT,
INSTALLING ALL HARDWARE, SECURING TOOLS AND
EQUIPMENT, AND COVERING OPEN HOLES WITH A RIGID
MATERIAL (PLYWOOD). CHILDREN WILL TRY TO USE
THE EQUIPMENT EVEN THOUGH ITS NOT FULLY
ASSEMBLED. YOU MUST TAKE ACTION TO PREVENT
INJURY AND DAMAGE.
3.
Once the first deck is installed and the concrete has set for 24 hours you
can install the remaining decks working out from the first deck ensuring
all decks and posts are square and level as you go.
4.
Level and plum all posts and decks and then brace them in position.
5.
Beginning at the lowest deck, install all playground components. When
installing the four hole brackets be sure to orientate the bracket so that
the setscrew faces down. Use the footing layout at the beginning of this
booklet to layout your component holes. Once the entire playground has
been installed and the entire unit is level you may start adding the
concrete.
FOOTING SIDE VIEW
Содержание Quick Ship 3 Modified
Страница 1: ... 012 3 4 5 2 6 7 8 9 8 6 0 5 4 72 2ABCDB EBCF GHB BIGJEB KCILCA MBNOEB MBPJIIJIP JIDGCAACGJOI ...
Страница 2: ......
Страница 4: ......
Страница 6: ......
Страница 7: ...QUICK SHIP 3 MODIFIED Installation Guide ...
Страница 8: ......
Страница 10: ......
Страница 12: ......
Страница 14: ......
Страница 21: ...Value Series Installation Guide 2 28 11 V C_OUTLINE V1 0211 14 Installation Punch List Footing Layout Example ...
Страница 29: ......
Страница 30: ...Value Series Installation Guide 2 28 11 V C_OUTLINE V1 0211 22 COMPONENT INSTALLATION INSTRUCTIONS ...
Страница 31: ......
Страница 34: ...March 10 2014 3 912 242 SQUARE DECK 46 INSTALLATION INSTRUCTION ...
Страница 41: ...March 13 2014 4 922 135 3 TRANSFER STATION INSTALLATION INSTRUCTION ...
Страница 51: ...March 11 2014 4 922 120 3 CORKSCREW 3 DECK INSTALLATION INSTRUCTION ...
Страница 59: ...March 10 2014 4 922 126 3 3 TRIPLE RAIL SLIDE INSTALLATION INSTRUCTION ...
Страница 67: ...March 13 2014 4 922 127 3 3 DOUBLE WALL STRAIGHT SLIDE INSTALLATION INSTRUCTION ELEVATION AND FOOTING LAYOUT ...
Страница 75: ...February 17 2010 4 912 807 SAND WATER PANEL INSTALLATION INSTRUCTION ...
Страница 85: ...May 1 2014 6 922 112 BUBBLE WINDOW INSTALLATION INSTRUCTION THIS PAGE WAS INTENTIONALLY LEFT BLANK ...
Страница 103: ...April 30 2014 6 912 275 PYRAMID ROOF INSTALLATION INSTRUCTION THIS PAGE WAS INTENTIONALLY LEFT BLANK ...
Страница 104: ...VALUE SERIES INSTALLATION APPENDIX 4 2 10 M C_APPENDIX V1 0410 1 INSTALLATION APPENDIX ...
Страница 105: ......
Страница 110: ...VALUE SERIES INSTALLATION APPENDIX 4 2 10 M C_APPENDIX V1 0410 6 ORIGINAL INSPECTION AND MAINTENANCE FORMS ...
Страница 111: ......
Страница 140: ...VALUE SERIES INSTALLATION APPENDIX 4 2 10 M C_APPENDIX V1 0410 8 COMPLETED INSPECTION AND MAINTENANCE FORMS ...