7
3. INSTALLATION PROCEDURES OVERVIEW
Procedure 1: Install the Mounting Bracket (pgs 8-12)
Procedure 2: Hardwire Inverter to a Dedicated Circuit Breaker (pgs 13-15)
Procedure 3: Unbox and Assemble Cardio Units ( See Individual Cardio Unit’s manual or you can find them at
http://www.sportsartamerica.com/saf/support/technicalsupport/owners_manuals.asp)
Procedure 4: Install the Boost Converters (pg 16)
Procedure 5: Link Boost Converters (pg 17)
Procedure 6: Connect Inverter to an End Boost Converter (pg 18)
Procedure 7: Conduct Post-Installation Checklist (Section 4, pgs 19-21)
Procedure 8: Perform Inverter Power Up Checklist (Section 5, pg 22)
Procedure 9: Set up Cardio Unit Consoles (Section 6, pg 23)
Procedure 10: Check Cardio Units for Proper Operation (See individual manuals)
Procedure 11: Submit Post-Installation Certification (Section 7, pg 24)
Pre-Installation Checklist
Installation Procedures Overview