WARNING!

The work of connecting the Inverter to the power grid must be carried out by a licensed/bonded electrician. 

Moreover, this work must be done in compliance with electrical regulations.

Inverter power supply must be connected to grid power via the facility electrical panel, and a circuit breaker 

must be used. Before connecting cables, make sure that the breaker is OFF.

Electrical power supply specifications: single phase 183 - 264VAC. If voltage exceeds this range, the Inverter 

will automatically shut off as a protective measure. For most consistent operation, we recommend a voltage 

range of 200 to 240VAC.

1. Power cable must be AWG 14 , 80C (176F ) or larger and have three stranded copper conducting wires.

2. Power cables wires and the strain relief must be placed as shown in Figure 1 below. First, strip the insulation 

from the wire cores and secure them into place in the protective cover as shown in Figure 2, then adhere the 

labels appropriately. Connect the power source L or L1 wire, and secure the L/L1 label to it. Connect the N or L2 

wire, and secure the N/L2 label to it. Connect the ground wire, and secure the G label to it as shown in Figure 

3. Before inserting the copper wire into the terminal, roll the wire to consolidate the strands and prevent them 

from splitting. Connect to the Inverter AC terminals by matching like markings with the labels on the Inverter. 

After inserting wires into the terminal, use screws to secure the wires into place. Note: In areas with 100 to 130V 

power supply, this product is suitable for L1, L2 power supply markings. In areas with 200 to 240V power supply, 

this product is suitable for L, N power supply markings.

3. Pull the wires individually (one-at-a-time) to make sure that each one is connected securely. Then secure the 

protective cover on the Inverter.

4. Connect the other end of the power cord to grid power. First, select a 15A  250VAC rated circuit breaker. 

Make sure that the circuit breaker is off before beginning installation.

5. Connect the ground wire to the ground terminal in the electrical panel. Connect L/L1 and N/L2 wires to corre-

sponding circuit breaker terminals to complete Inverter-to-grid power connections. Leave the Inverter power 

switch off until the entire Pod is installed and all Boost Converters are connected.

Figure 1. 

Figure 2. 

Figure 3. 

3. INSTALLATION PROCEDURES OVERVIEW (CONTINUED)

Installation Procedures Overview

Содержание Green System

Страница 1: ...Green System Customer Planning Guide REV 1 5 21 2013...

Страница 2: ...2 WARNING A LICENSED ELECTRICIAN IS REQUIRED TO INSTALL THIS PRODUCT IT IS HIGHLY RECOMMENDED THAT THE INVERTER BE AVAILABLE FOR THE ELECTRICIAN PRIOR TO SYSTEM INSTALLATION...

Страница 3: ...and Operation 23 7 Post Installation Certifications 24 CongratulationsforincludingSportsArt space settingGreenSysteminyourfacility This cutting edge technology puts your facility in the forefront of...

Страница 4: ...hs Inverter to first Boost Converter one 5m or 16 5 cable comes attached to Inverter Individual Boost Converter cables one 1 2m or47 cablecomeswitheachBoostConverter Optional Special Order 8m or 26 3...

Страница 5: ...provide site planning assistance 4 Determine the Boost Converter cable lengths required See page 4 for available lengths Add up all Boost Converter cable lengths plus 12 for each Boost Converter in t...

Страница 6: ...l Connections 2 Prepare for installing Inverter Mounting Bracket s Pgs 8 12 by coordinating best location with electrician and reviewing with installers It is recommended that the Inverter be mounted...

Страница 7: ...s_manuals asp Procedure 4 Install the Boost Converters pg 16 Procedure 5 Link Boost Converters pg 17 Procedure 6 Connect Inverter to an End Boost Converter pg 18 Procedure 7 Conduct Post Installation...

Страница 8: ...A4 InverterDCpowercord Inverter to BoostConverter 1 Components in the Hardware Kit No Name Qty Specification Notes 21 Mushroom top Phillips screw 4 3 16 L1 22 Plastic anchor for screws 4 5 16 1 1 4 2...

Страница 9: ...height 1 1 2 lower than the top mounting bracket screws Mount at a height that will make the display easy to read b Insert one screw anchor 22 into each of the four holes Secure screws 21 in the upper...

Страница 10: ...NUED d Slide the mount bracket to the left or right until it is level Then fully secure upper screws 21 into place Insert and secure lower screws 21 into place Finally remove screws 41 from the mount...

Страница 11: ...er mounting bracket as follows First place the left wing of the Inverter bypass onto the mounting bracket Then place the right wing of the Inverter bypass onto the mounting bracket Use screws 23 to se...

Страница 12: ...12 Hang the Inverter A1 onto the mount bracket A3 and use screws 41 to secure it into place 3 INSTALLATION PROCEDURES OVERVIEW CONTINUED Installation Procedures Overview...

Страница 13: ...landing protection Operation temperature range 5 35 C Storage temperature range 5 35 C Enclosure Type 1 indoor use only Inverter Electronic Specifications DC Maximum input voltage 480V DC Operating vo...

Страница 14: ...ground wire and secure the G label to it as shown in Figure 3 Before inserting the copper wire into the terminal roll the wire to consolidate the strands and prevent them from splitting Connect to th...

Страница 15: ...on Power Products Do not replace it with any other type of connector 2 The DC cords comply with UL AWM 2586 specifications AWG16 105 C 221 F 600V three wire with colors red black and green with yellow...

Страница 16: ...a A and B on the Cardio Unit in order 1 2 Note In area A place the open line with no wire on top In area B directly insert the plug into the connector on the Cardio Unit 3 Align the holes in the Boost...

Страница 17: ...nector covers on the sides of the Boost Converter A12 Insert the between unit power cord A13 into the connector on the Boost Converter Then use screws to secure the connection Only connect up to ten p...

Страница 18: ...tches on the Boost Converter and the cardio unit to the off position Remove the protective cover on the side of the selected end Boost Converter Connect the DC power cord A4 from the Inverter to the s...

Страница 19: ...ectrical panel circuit breaker and Inverter power switch are turned off If not turn off power in those areas to prevent electrical shock during the inspection ITEM 2 Inspect the Inverter Boost Convert...

Страница 20: ...rotate the plastic coupling nut clockwise until it hits bottom and makes a click sound Make sure both the black and white cable connectors latch properly Note G872 and G572 G862 power plug installati...

Страница 21: ...erter bypass mode Load resistor mode Load resistor mode is used in the event of an Inverter malfunction This mode requires the use of the Inverter bypass box ITEM 6 Make sure that the Cardio Unit Boos...

Страница 22: ...s are detailed in the Inverter Installation Manual The Startup Screen will display for approximately 10 seconds then the initial Operation Screen will be displayed Hold the Reset Button for 1 sec to s...

Страница 23: ...tems attached to one Inverter At the startup banner screen simultaneously press and hold the following keys for two seconds WORKOUT LEVEL WORKOUT LEVEL CHANGE DISPLAY PASSWORD 0000 will appear on scre...

Страница 24: ...an signoffs 1 Boost Converter to Cardio Unit cable connectors fully seated 2 Boost Converter interconnect cables connected and secured 3 Inverter connected to endmost Boost Converter 4 All Cardio Unit...

Отзывы: