23
6. CARDIO UNITS SETUP AND OPERATION
ITEM 1: Set Up Cardio Unit Consoles
Important note: Specifying the number of Cardio Units per Inverter is important. Otherwise
system overload may occur, making resistance drop suddenly. Follow instructions below to
input into each Cardio Unit console the number of items attached to one Inverter.
At the startup banner screen, simultaneously press and hold the following keys for two seconds:
<WORKOUT LEVEL ▲>+<WORKOUT LEVEL ▼>+<CHANGE DISPLAY>
“PASSWORD-0000” will appear on screen.
Input password “8250”. Then follow prompts to input the number of Cardio Unit connected to the
Inverter.
Press these 3 keys at the same
time to set up the quantity.
ITEM 2: Operate each Green System Cardio Units to confirm proper operation including
resistance, power, etc.
Inverter Power Up Checklist
Cardio Units Setup and Operation