![background image](http://html.mh-extra.com/html/spm/ice-dream-1/ice-dream-1_operators-manual_1349085050.webp)
Data di emissione:
Aprile, 2011
Revisione:
1
Pag. :
50/124
Once performed all these cleaning and sanitizing
procedures, it’s possible to reassemble all the
components.
The correct assembly of the device is essential
to prevent leakage of product and damage of
the machine. To assemble the machine you will
need an approved lubricant (such as Vaseline).
Make sure all parts have been washed and
sanitized before assembling. Persons assembling
the machine must first wash and sanitize their
hands and forearms with an approved sanitizer.
- Mount the mixing unit back together,
according to the following procedures (see
figure 20):
•
It’s indispensable to spread the gaskets
(O) with Vaseline grease to reduce
friction and thus limit wear (fig.21).
•
Mount the bowl seal (P) making sure it
faces the right direction (fig.22).
•
Replace the scraper auger (N), making
sure the head is perfectly engages with
the driving shaft.
•
Secure all the parts into place by
screwing the bolt (M) in a counter
clockwise direction.
- Mount the bowl (A) back on, positioning it into
place, and making sure that it has a tight hold
on its washer (see figure 23). To facilitate this
procedure, we also suggest that the rear part of
the bowl be moistened at the point in which it
fits together with its sealing washers.
- Secure the bowl (A) by tightening the two
knobs, without exerting excessive pressure.
IMPORTANT
Do not over tighten the bowl knobs.
Excessive force could damage the thread
and/or the bowl itself.
Fig. 20
Fig. 21
Fig. 22
Fig. 23
Содержание Ice Dream 1
Страница 112: ...Data di emissione Aprile 2011 Revisione 1 Pag 112 124 15 WIRING DIAGRAMS ...
Страница 113: ...Data di emissione Aprile 2011 Revisione 1 Pag 113 124 ...
Страница 114: ...Data di emissione Aprile 2011 Revisione 1 Pag 114 124 ...
Страница 115: ...Data di emissione Aprile 2011 Revisione 1 Pag 115 124 ...
Страница 116: ...Data di emissione Aprile 2011 Revisione 1 Pag 116 124 ...
Страница 117: ...Data di emissione Aprile 2011 Revisione 1 Pag 117 124 ...
Страница 118: ...Data di emissione Aprile 2011 Revisione 1 Pag 118 124 ...
Страница 119: ...Data di emissione Aprile 2011 Revisione 1 Pag 119 124 ...
Страница 120: ...Data di emissione Aprile 2011 Revisione 1 Pag 120 124 ...
Страница 121: ...Data di emissione Aprile 2011 Revisione 1 Pag 121 124 ...
Страница 122: ...Data di emissione Aprile 2011 Revisione 1 Pag 122 124 ...
Страница 124: ...Data di emissione Aprile 2011 Revisione 1 Pag 124 124 Company with certified quality management system UN EN ISO 9001 ...