Data di emissione:
Aprile, 2011
Revisione:
1
Pag. :
38/124
Only for HC version
!WARNING!
HC units are equipped with a safety pressure
switch for the refrigerating system; if the unit
internal temperature would became too high the
pressure switch will block the compressor.
When the unit is running hot due to insufficient
internal air circulation and the pressure switch
blocks the compressor, the red LED on the
control panel is switched on (fig.10).
In order to restore the standard functioning, it
will be necessary to determine the condition
that caused the alarm and then to manually re-
start the compressor by pushing the red button
under the unit.
To determine the condition that caused the
alarm, see list of conditions below:
• Condition: The condenser is dirty and needs to
be cleaned.
Corrective Action: Clean the condenser following
instructions (Special maintenance).
• Condition: The unit is positioned too close to a
wall or other object restricting air flow and
causing the machine to run at a higher
temperature.
Corrective Action: Reposition unit to maximize
ventilation space (Positioning).
• Condition: The unit has been installed near a
heat source, such as a coffee machine, ice
maker or cold beverage machine which expels
hot air from its vents, causing the machine to
run at a high temperature (installation near a
heat source should be avoided)
Corrective Action: Reposition unit to maximize
ventilation space.
Fig. 10
Содержание Ice Dream 1
Страница 112: ...Data di emissione Aprile 2011 Revisione 1 Pag 112 124 15 WIRING DIAGRAMS ...
Страница 113: ...Data di emissione Aprile 2011 Revisione 1 Pag 113 124 ...
Страница 114: ...Data di emissione Aprile 2011 Revisione 1 Pag 114 124 ...
Страница 115: ...Data di emissione Aprile 2011 Revisione 1 Pag 115 124 ...
Страница 116: ...Data di emissione Aprile 2011 Revisione 1 Pag 116 124 ...
Страница 117: ...Data di emissione Aprile 2011 Revisione 1 Pag 117 124 ...
Страница 118: ...Data di emissione Aprile 2011 Revisione 1 Pag 118 124 ...
Страница 119: ...Data di emissione Aprile 2011 Revisione 1 Pag 119 124 ...
Страница 120: ...Data di emissione Aprile 2011 Revisione 1 Pag 120 124 ...
Страница 121: ...Data di emissione Aprile 2011 Revisione 1 Pag 121 124 ...
Страница 122: ...Data di emissione Aprile 2011 Revisione 1 Pag 122 124 ...
Страница 124: ...Data di emissione Aprile 2011 Revisione 1 Pag 124 124 Company with certified quality management system UN EN ISO 9001 ...