Water cooled system
In addition to these start-up procedures, only
for the water cooled version, it’s necessary to
connect the unit to the water main as described
below:
- Connect the unit to the water main with the
flexible filling pipe fitted with the ¾ connections.
!WARNING!
It is strongly recommended to interpose a tap
between the mains and the filling pipe; if the
unit is not working, this tap has to be closed.
- Connect the unit with a suitable draining
system by using the meshed pipe that you will
find together with the unit. After connecting this
pipe to the fastening junction under the frame,
remember to fix it with an hose clamp.
NOTE:
the average of water consumption is
almost 1liter/minute.
In case of lack of water from the main during
the standard operating phase, the manual start
up safety pressure switch will block the unit and
the red LED on the switch panel will be switched
ON (fig.8); in this condition the machine is still
operating but the compressor is not working.
After checking the water presence in the main,
manually switch on the safety pressure switch
sited under the frame near the right side of the
unit by pressing the red jutting button.
After this operation, the red LED will be
switched off and the compressor will re-start
working normally.
Fig. 8
Содержание Ice Dream 1
Страница 112: ...Data di emissione Aprile 2011 Revisione 1 Pag 112 124 15 WIRING DIAGRAMS ...
Страница 113: ...Data di emissione Aprile 2011 Revisione 1 Pag 113 124 ...
Страница 114: ...Data di emissione Aprile 2011 Revisione 1 Pag 114 124 ...
Страница 115: ...Data di emissione Aprile 2011 Revisione 1 Pag 115 124 ...
Страница 116: ...Data di emissione Aprile 2011 Revisione 1 Pag 116 124 ...
Страница 117: ...Data di emissione Aprile 2011 Revisione 1 Pag 117 124 ...
Страница 118: ...Data di emissione Aprile 2011 Revisione 1 Pag 118 124 ...
Страница 119: ...Data di emissione Aprile 2011 Revisione 1 Pag 119 124 ...
Страница 120: ...Data di emissione Aprile 2011 Revisione 1 Pag 120 124 ...
Страница 121: ...Data di emissione Aprile 2011 Revisione 1 Pag 121 124 ...
Страница 122: ...Data di emissione Aprile 2011 Revisione 1 Pag 122 124 ...
Страница 124: ...Data di emissione Aprile 2011 Revisione 1 Pag 124 124 Company with certified quality management system UN EN ISO 9001 ...