
IM-P505-02-US
Issue 1
17
UTM20 Series Ultrasonic Transit-time Flowmeters
Fig. 11
Fig. 12
5.
Insert a wire for earth ground under the grounding bracket (see Figure 12 ) and screw it down tight.
6.
Partially loosen the 2 enclosure captive screws on the left side of the transmitter cover. Completely
loosen the 2 screws on the right side. Grasp and lift the cover and open it to the left. The cover
remains attached and the left screws act as a hinge.
4 screws