Form 43343110
-38-
May 2021
SINGLE HEATER VENTING (VERTICAL THROUGH THE ROOF)
1.
When venting the heater to outside of building through a roof, use single-wall metal pipe. This is to be
constructed of galvanized sheet metal or other approved noncombustible corrosion-resistant material as
allowed by state or local codes.
2.
A vent passing through a combustible roof shall extend through an approved clearance roof thimble. Double-
wall, Type B vent must be used for the portion of the vent system which passes through the combustible roof.
An approved vent cap must be attached to end of the flue.
3.
The maximum equivalent length of vent pipe should be carefully observed. A safety switch in the heater is
designed to shut the heater off before excessive flue restriction causes bad combustion. Refer to the Vent
Sizing Table for maximum vent lengths and vent pipe diameter.
4.
Joints between sections of piping shall be fastened by sheet metal screws or other approved means and
should be sealed to prevent leakage of flue gas into building. Aluminum or Teflon tape suitable for 550ºF
(3M Company tapes 433 or 363) or silicone sealant is recommended.
5.
All portions of the vent pipe shall be supported to pr
event from sagging (6’ spacing is recommended).
6.
When the vent pipe passes through areas where the ambient temperature is likely to induce condensation of
the flue gases, the vent pipe should be insulated and a condensation drain should be provided.
7.
Minimum clearance for single-wall flue pipe to combustible material shall be 6 inches. This may be reduced
when the combustible material is protected as specified in the National Fuel Gas Code or the authority having
jurisdiction.
8.
Single-wall metal pipe shall not originate in any unoccupied attic or concealed space and shall not pass
through any attic, inside wall or concealed space, or through any floor. For the installation of a single-wall
metal pipe through an exterior combustible wall, refer to latest edition of the National Fuel Gas Code or the
authority having jurisdiction.
9.
A venting system shall terminate at least 3 ft. above any forced air inlet located within 10 ft.
SINGLE HEATER VENTING (HORIZONTAL THROUGH SIDEWALL)
When venting the heater horizontally through a combustible outside sidewall, the same requirements listed
previously for venting Vertical Through The Roof apply except as follows:
1.
A vent passing through a combustible wall must pass through an approved clearance thimble (Air-Jet #4VT or
Ameri-Vent #4EWT or other thimbles) that are listed by a nationally recognized testing agency; double wall
Type B vent must be used for the portion of the vent system which passes through the combustible sidewall.
2.
An approved vent cap (Breidert or equal) must be attached to the end of the vent pipe.
NOTE: To minimize problems associated with condensation in long horizontal runs, vent pipe can be insulated.
3.
Use the following correction factors to obtain the equivalent length when elbows are used:
•
Subtract 10 ft. for each elbow beyond 15 ft. from the heater.
•
Subtract 15 ft. for each elbow within 15 ft. of the heater.
4.
Limit to (2) 90º elbows in the vent system.
5.
When venting through a sidewall, the horizontal vent pipe shall fall 1/4 inch per 10 feet down from the start
of the vent system to the vent terminal. All portions of the vent pipe shall be supported to prevent sagging.
(6’ spacing is recommended)
Содержание PCA-SS 100
Страница 13: ...Form 43343110 12 May 2021 7 1 DIMENSIONS STRAIGHT CONFIGURATION 48 HANGING CENTERS...
Страница 14: ...Form 43343110 May 2021 13 7 2 HEATER ASSEMBLY JOINING OF TUBE SECTIONS...
Страница 21: ...Form 43343110 20 May 2021...
Страница 48: ...Form 43343110 May 2021 47 19 0 TROUBLESHOOTING GUIDE SINGLE STAGE N5 L5...
Страница 49: ...Form 43343110 48 May 2021 TROUBLESHOOTING GUIDE SINGLE STAGE CONTINUED...
Страница 50: ...Form 43343110 May 2021 49 TROUBLESHOOTING GUIDE SINGLE STAGE CONTINUED...
Страница 51: ...Form 43343110 50 May 2021 19 1 TROUBLESHOOTING GUIDE TWO STAGE N7 L7...
Страница 52: ...Form 43343110 May 2021 51 TROUBLESHOOTING GUIDE TWO STAGE CONTINUED...
Страница 53: ...Form 43343110 52 May 2021 TROUBLESHOOTING GUIDE TWO STAGE CONTINUED...
Страница 55: ...Form 43343110 54 May 2021 20 2 REMOVING GAS VALVE AND MANIFOLD ASSEMBLY 20 3 AIR SWITCH PRESSURE CHECK...