
Form 43343110
-18-
May 2021
4.
Slide the next tube into the coupling.
5.
Make sure both tube ends are butted together.
6.
Finish tightening both bolts to 40-60 ft./lbs. torque to ensure a complete seal.
7.
Use the two Self-drilling screws through the pre-punched holes to secure the tubes in the coupling.
8.
Check to ensure that the hardware is completely closed and the band is seated on the reaction block and
interference pins as illustrated above.
9.
Once all the heater body sections are attached, make sure that the heater system is level. If it is not, slight
adjustments can be made using the turnbuckles. (See Section 8.0)
Important: NEVER reuse a coupling.. Always install a new coupling only and torque as per instructions above and
the diagrams below.
Содержание PCA-SS 100
Страница 13: ...Form 43343110 12 May 2021 7 1 DIMENSIONS STRAIGHT CONFIGURATION 48 HANGING CENTERS...
Страница 14: ...Form 43343110 May 2021 13 7 2 HEATER ASSEMBLY JOINING OF TUBE SECTIONS...
Страница 21: ...Form 43343110 20 May 2021...
Страница 48: ...Form 43343110 May 2021 47 19 0 TROUBLESHOOTING GUIDE SINGLE STAGE N5 L5...
Страница 49: ...Form 43343110 48 May 2021 TROUBLESHOOTING GUIDE SINGLE STAGE CONTINUED...
Страница 50: ...Form 43343110 May 2021 49 TROUBLESHOOTING GUIDE SINGLE STAGE CONTINUED...
Страница 51: ...Form 43343110 50 May 2021 19 1 TROUBLESHOOTING GUIDE TWO STAGE N7 L7...
Страница 52: ...Form 43343110 May 2021 51 TROUBLESHOOTING GUIDE TWO STAGE CONTINUED...
Страница 53: ...Form 43343110 52 May 2021 TROUBLESHOOTING GUIDE TWO STAGE CONTINUED...
Страница 55: ...Form 43343110 54 May 2021 20 2 REMOVING GAS VALVE AND MANIFOLD ASSEMBLY 20 3 AIR SWITCH PRESSURE CHECK...