1 (E)
ZRD-1/ZRD-2/ZRCT-100/ZRCT-200
Table of Contents
Manual Structure
Purpose of this manual ............................................................ 3 (E)
Related manuals ...................................................................... 3 (E)
Trademarks .............................................................................. 3 (E)
Description by serial numbers ................................................ 4 (E)
Description by models ............................................................ 4 (E)
1. Installation
Outline
1-1. System Configuration ................................................1-1 (E)
1-1-1.
Whole System ..................................................1-1 (E)
1-1-2.
Number of Display Units and
Display Controllers ..........................................1-2 (E)
1-1-3.
Signal Format ...................................................1-3 (E)
1-2. Installation Flowchart ................................................1-8 (E)
1-3. Required Equipment/Tools ........................................1-9 (E)
1-3-1. Base
................................................................ 1-11
(E)
1-3-2.
Back Frame ....................................................1-15 (E)
1-4. Cautions on Installation, Operation,
and Storage ..............................................................1-18 (E)
1-4-1.
Display Unit ...................................................1-18 (E)
1-4-2.
Display Controller..........................................1-20 (E)
1-4-3.
Back Frame ....................................................1-21 (E)
1-4-4. Floor
...............................................................1-21
(E)
1-4-5.
Work Space ....................................................1-21 (E)
1-5. Installation Environment .........................................1-22 (E)
1-5-1.
Design of Air Intake/Heat Exhaust ................1-22 (E)
1-5-2.
Electrical (Lighting) Construction .................1-22 (E)
1-6. Power Cord ..............................................................1-22 (E)
2. Installation of Display Unit
2-1. Installation Flow ........................................................2-1 (E)
2-2. Unpacking Procedure ................................................2-4 (E)
2-3. Installation Order.......................................................2-6 (E)
2-4. Installation
.................................................................2-8
(E)
2-4-1. Preparation
.......................................................2-8
(E)
2-4-2.
Required Equipment/Tools ..............................2-8 (E)
2-4-3.
Installation of the First Display Unit
in the System ....................................................2-9 (E)
2-4-4.
Installation of First Display Unit
in the Row ......................................................2-19 (E)
2-4-5.
Installation of Other Display Units ................2-26 (E)
2-4-6.
External Dimensions and Installation Space
of Unit Alignment Tool ..................................2-35 (E)
2-4-7.
Adjustment Screen Display of
Unit Alignment Tool ......................................2-36 (E)
2-4-8.
Adjustment Mechanism .................................2-38 (E)
2-5. Connection of Display Units and Back Frame ........2-41 (E)
2-6. Procedure after Assembling the Array ....................2-42 (E)
2-6-1.
Fine Adjustment in the Z direction ................2-42 (E)
2-6-2.
Installation of Protective Materials ................2-46 (E)
3. Installation of Display Controller
3-1. Installation Space ......................................................3-1 (E)
3-1-1.
External Dimensions ........................................3-1 (E)
3-1-2.
Precautions on Installation Space ....................3-2 (E)
3-2. Rack Mounting ..........................................................3-3 (E)
3-2-1.
Required Equipment/Tools ..............................3-3 (E)
3-2-2.
Installation in Rack ..........................................3-4 (E)
4. Precautions on Design of Electric
Equipment
5. Connection
5-1. Connection of Display Unit and
Display Controller .....................................................5-1 (E)
5-2. Connection in System................................................5-2 (E)
5-3. Binding of Cables ......................................................5-3 (E)
6. Settings and Adjustments by Using
Display Control Software
6-1. Installing the Display Control Software ....................6-1 (E)
6-2. Changing the IP Address of Display Controller ........6-5 (E)
6-3. Initial Settings ...........................................................6-7 (E)
6-3-1.
Controller Connection Setting .........................6-7 (E)
6-3-2.
Display Unit Layout Setting ............................6-9 (E)
Содержание ZRCT-100
Страница 6: ......
Страница 34: ......
Страница 37: ...2 3 E ZRD 1 ZRD 2 ZRCT 100 ZRCT 200 Check operation ...
Страница 88: ......
Страница 156: ......