5
EN
- FREEVIA LINE installation and operating guide - SOMFY
EN
Prerequisites for installation
Stop blocks on the ground
Positioning the motor
Electrical pre-equipment
The gate travel must be defined by end stops firmly fixed in the ground.
Closing end stop
Opening end stop
Gate
Concrete base
Cable feed
Cables required
•
Power supply: 3 x 1.5 mm² cable or
3 x 2.5 mm² for outdoor use
(type H07RN-F minimum)
•
Linking of cells: 2 x 0.75 mm² cable
•
Other accessories: see page 6
Provision must be made for the supply cable
to be fed through according to the electrical
standards in force in the country of use.
If a cable conduit cannot be made,
use a cable grommet which will
withstand the passage of vehicles
(ref. 2400484).
Cable feed
•
Underground cables must be equipped with a
protective sheath with a sufficient diameter to
contain all the cables.
•
Fit a 230 V electrical input as close as possible
to the motor.