October, 2005
415 L LS Operator And
425 D Control Panel
Installation Manual
CONTENTS
T
H E
4 1 5 L L S O
P E R A T O R
A N D
4 2 5 D C
O N T R O L
P
A N E L
:
I
N S T A L L A T I O N
M
A N U A L
FAAC International, Inc.
303 Lexington Avenue
Cheyenne, WY 82007
www.faacusa.com
Important Safety Information
2
Technical Data
4
Unpacking the Operator
5
The 415 L LS Operator General Characteristics
6
Installation Instructions
6
Prepare the Gate
6
Manual Release Mechanism
6
Attach the Electric Cables
7
Install the Operator
7
Attach the Rear Mounting Bracket
8
Attach the Front Mounting Bracket to the Gate Leaf
8
Attach the Operator to the Rear Mounting Bracket
9
Attach the Operator to the Front Mounting Bracket
9
Adjusting the Limit Switches
10
Install the 425 D Control Panel
10
Exploded View, 415 L LS Operator
12
415 L LS Operator Parts List
13
The 425 D Control Panel General Description
14
Installing the 425 D Control Panel
14
Connect the Main Power Supply
14
Connect the Operator to the Control Panel
14
Connect Accessory Devices
15
Set Operating Modes
16
Setting the DIP Switches
17
Obstacle Recognition
17
Programming
19
Display Descriptions
20
Programming the Motor Run Time
20
Fuse Ratings
20
Maintenance
21
Safety in Gate Design
21
Troubleshooting
22
Limited Warranty
23
The
425
D C
o
nt
ro
l Pane
l
Ins
tallat
ion I
n
st
ruc
tion
s