20
Direction
Minimum clearance
Above
30 cm
Below
30 cm
Sides
10 cm
5.4 Mounting Procedure
1) Mark 4 positions of the drill holes on the wall according to the wall mounting bracket in the
carton box.
300
253
(
Depth 50mm
)
2) According to the marks, drill 4 holes in the wall. Then, place four expansion tubes in the
holes using a rubber hammer. Next, make 4 screws through the mounting holes in the
bracket, then tighten the screws into the expansion tubes. so far, the w
all
mounting bracket
is fixed already.
Содержание OXYGEN 3400
Страница 2: ......
Страница 10: ...8 3 Product Information 3 1 Overview Industrial Layout Excellent Heat Elimination ...