6 Commissioning
6.1
Inspections prior to startup
Go through the following check lists before you startup the inverters and the MCU for the
first time. Keep the filled-out check lists for service requests.
6.1.1 Identification and characteristics
Plant name
Street, postal code, town
Plant output
Date of first startup
TS-SV Master Control Unit:
S/N:
TS-SV inverter #1
S/N:
TS-SV inverter #2
S/N:
TS-SV inverter #3
S/N:
TS-SV inverter #4
S/N:
Type and quantity of generator connection
boxes
MaxWeb xp
S/N:
Quantity Power units
6.1.2 Station
Nr.
OK
NOK Check
1.
❑
❑
The station (site) meets the IP standard and the specs contained in the installation manual.
2.
❑
❑
The minimum ventilation of 5 000 m
3
/h per inverter is provided.
3.
❑
❑
The ventilation inlets and outlets are open and free of blockage.
4.
❑
❑
The ventilation inlets are at least 15 cm above the floor.
5.
❑
❑
The regulations regarding the replacement of ventilation filters (if necessary) are available
at the site.
6.
❑
❑
The thermostat is set to 30 °C.
7.
❑
❑
The covers on the ventilation inlets (if necessary, e.g. screens against rodents) are in
place.
8.
❑
❑
Water or snow cannot penetrate into the station.
9.
❑
❑
Condensation (formation of droplets) cannot penetrate into the inverter.
10.
❑
❑
The inverters in the station are easily accessible for maintenance work.
11.
❑
❑
The minimum distances from the inverter to other inverters and objects in the station is at
least 1 meter.
12.
❑
❑
The minimum distance between the inverter and the ceiling is 50 cm.
13.
❑
❑
The maximum floor load of the site has not been exceeded.