Connecting to the Grid and to Backed-up Loads
This section describes:
l
Connection to the AC Grid.
l
Connection between the inverter to the backed-up loads panel.
NOTE
If there are multiple inverters in the installation, each inverter should be connected to a separate
backed-up loads panel. Do not share backup output between inverters.
Figure 27: Connection to grid, backed-up loads
Prepare cables and connect as described in the following table:
Recommended cable type
(min-max AWG)
Connection Unit con-
nection
External connection
Grid
6 AWG (4-20 AWG)
3-pin terminal block: Grid L1
Main distribution panel: L1
3-pin terminal block: Grid L2
Main distribution panel: L2
3-pin terminal block: Grid N
Main distribution panel: N
Min. 10 AWG grounding wire
to ground
Backed-up loads panel
6 AWG (4-20 AWG)
3-pin terminal block: L1
Backed-up loads panel: L1
3-pin terminal block: L2
Backed-up loads panel: L2
3-pin terminal block: N
Backed-up loads panel: N
Min. 10 AWG grounding wire
to ground
Chapter 6: StorEdge Inverter Connections
SolarEdge
-
StorEdge Installation Guide MAN-01-00262-1.3
43
Содержание StorEdge SE7600A-US1
Страница 1: ...SolarEdge StorEdge Solution with Backup Installation Guide For North America Version 1 3 ...
Страница 116: ......