![SolarEdge StorEdge SE7600A-US1 Скачать руководство пользователя страница 37](http://html1.mh-extra.com/html/solaredge/storedge-se7600a-us1/storedge-se7600a-us1_installation-manual_1313757037.webp)
detail cable types and connections of one battery (LG-chem
Resu10H). Prepare cables and connect as described in the following table:
StorEdge
Connection Unit
connection
LG Chem
RESU10H
battery
connection
Connection method
to the
Connection Unit
Recommended cable
type
(min-max AWG)
DC
BAT +
terminal block
DC+
o
Insert a flat blade
screwdriver into the
square opening at the top
of the terminal block and
press to open clamp
mechanism.
o
Insert the wire into the
round opening and
release the screwdriver
to spring back and clamp
the wire.
DC cable 10 AWG (10-14
AWG), 600V insulated.
BAT -
terminal block
DC-
Control and monitoring
5-pin communication
terminal block:
6-pin connector
Press the protrusion at the
top of the terminal block to
open the connection hole,
insert the wire and release to
spring back and clamp the
wire.
5-wire shielded twisted pair
cable 24 AWG (16-24AWG),
600V insulated.
CAT5 600V insulated can
also be used.
En (Enable)
ENABLE_H
V+
Not connected
B- (RS485)
1
RS485_L -
2
A+ (RS485)
1
R
2
G (RS485)
EN_G
1Must be twisted pair
2Must be twisted pair
Chapter 6: StorEdge Inverter Connections
SolarEdge
-
StorEdge Installation Guide MAN-01-00262-1.3
35
Содержание StorEdge SE7600A-US1
Страница 1: ...SolarEdge StorEdge Solution with Backup Installation Guide For North America Version 1 3 ...
Страница 116: ......