Revision History
Version 1.2 (Feb. 2019)
Added appendix 'Determining the Circuit Breaker Size' and paragraph.
referencing to it, in the 'Grid Connection Guidelines' section.
Updated guidelines for use of extension cables in power optimizer installation.
Torque for plastic cover screws 10.3 N*m/ 7.5 lb-ft.
In Specifications removed 'Recommended OCPD size per grid' table.
Version 1.1 (Dec. 2018)
Updated communication options and menus
Version 1.0 (Sept. 2018)
Initial release
-
Three
Phase
System
Installation
Guide
MAN-01-00527-1.
2
4
Revision History
Added Proposition 65 warning (for California).