![SolarEdge SE10KUS Скачать руководство пользователя страница 55](http://html1.mh-extra.com/html/solaredge/se10kus/se10kus_installation-manual_1313733055.webp)
1. Select the Communication menu to define and configure the following:
The communication option used by the inverter to communicate with the
monitoring platform
The communication option used to communicate between multiple
SolarEdge devices or other external non-SolarEdge devices, such as
electricity meters or loggers.
2. Tap the Server red arrow to set the communication method to be used for
communication between devices and the SolarEdge monitoring platform. The
default is LAN.
NOTE
The Server menu shows only the communication options installed in the
inverter.
For detailed information about all the configuration options, refer to the
Communication Options Application Note, available on the SolarEdge
website at
https://www.solaredge.com/sites/default/files/solaredge-
communication_options_application_note_v2_250_and_above.pdf
.
Power Control
Power control options are detailed in the
Power Control Application
Note, available on the SolarEdge website at .
The Grid Control option may be disabled. Enabling it opens additional
options in the menu.
The Energy Manager option is used for setting power export limitation,
as described in the
Export Limitation Application Note, available on the
https://www.solaredge.com/sites/default/files/export_
limitation_application_note_NA.pdf
For P(Q) diagram refer to
https://www.solaredge.com/sites/default/files/application_note_p_q_diagram_of_
.
-
Three
Phase
System
Installation
Guide
MAN-01-00527-1.
2
54
Step 2: Commissioning and Configuring the Installation