Commissioning the Installation
SolarEdge Installation Guide – MAN-01-00002-1.6
56
Chapter 4
Commissioning the Installation
Commissioning – Workflow
The following workflow describes how to activate the system, commission the
installation and verify the proper functioning of the system.
Step 1, Activating the System,
page 57
Step 2, Pairing
Power Optimizers to the Inverter,
page 58
Step 3, Verifying Proper Operation,
page 60
Step 4, Reporting and Monitoring
Installation Data,
page 61
NOTE:
Keep this manual accessible and preferably near the inverter.