Solarbayer GmbH
13
MOUNTING INSTRUCTION
High capcity collector PremiumPlan
rail connectors
Installation of the rail connectors
1
st
step:
Pre-mount the rail connector with
coach bolts, snap rings and nuts.
These parts are ne-
cessary for the rails’
extension:
rail connectors
(if necessary)
coach bolts
M 10
2
nd
step:
Shift the heads of the coach
bolts into the rail’s groove
3
rd
step:
Coalesce both rails and tighten
the screws