background image

FOR THE HEIGHT, WIDTH, & DEPTH OF YOUR CPU.  MAKE SURE THE CPU HAS 

PAGE 1 OF 3

ENOUGH CLEARANCE TO ROTATE LEFT & RIGHT AS FAR AS YOU WANT IT TO 

1

VERSION DATED:  8/15/11

ROTATE.

STEP 2:  

REMOVE THE CPU HOLDER FROM THE TRACK  

SQUARE

2

TAPE MEASURE

#2 SQUARE HEAD DRIVER BIT

#2 PHILLIPS DRIVER BIT OR

CORDLESS DRILL

TOOLS REQUIRED FOR ASSEMBLY:

READ ALL THE INSTRUCTIONS BEFORE BEGINNING

  BY SLIDING IT OUT

TOWARD THE FRONT AND SET IT ASIDE.  

STEP 3:  

HARDWARE PACK # 50519

EXPOSE THE GLUE DOTS ON THE TOP OF THE TRACK  

1

  BY PULLING

THE PAPER STRIPS OFF THE TRACK.  POSITION THE TRACK IN THE LOCATION 
SHOWN AND PRESS IT FIRMLY IN PLACE SO THE GLUE DOTS WILL HOLD THE 
TRACK TO THE BOTTOM OF THE WORKSURFACE.

IMPORTANT NOTE:  THE WORKSURFACE MATERIAL MUST BE COMPATIBLE WITH 
THE SCREWS PROVIDED.  THE WORKSURFACE MUST BE AT LEAST 1" THICK.

INSTRUCTION # 50576

STEP 4:  

ATTACH THE TRACK  

1

  .  DO NOT OVER-TIGHTEN THE SCREWS.  USE A LOW TORQUE

  TO THE WORKSURFACE WITH (4) WOOD

SCREWS  
SETTING ON THE DRILL.

200CPU HOLDER INSTALLATION INSTRUCTIONS:

STEP 1:  

DETERMINE THE LOCATION TO MOUNT THE CPU HOLDER ALLOWING

ITEM # PART #

DESCRIPTION

QTY.

1

50093 16" TRACK ASSY

1

2

51708 M5 x 18mm SQ/PH/WSHR HEAD WOOD SCREW 

4

3

200CPU ECONOMY CPU HOLDER

1

4

52679 8-32 x 3/8 PHILLIPS TRUSS HEAD MACHINE SCREW

2

5

50330 #20/3 WIRE PULL HANDLE

1

6

50232 FRONT STOP

1

7

50200 10-24 x 1/2 SELF TAPPING MACHINE SCREW

2

6703 ZINSER ST., SCHOFIELD, WI 54476

PHONE: 800.298.4351 FAX: 866.882.9475

www.raproducts.com

K&A MANUFACTURING

1

PAPER STRIPS
COVERING 
GLUE DOTS

STEP 3

WORKSURFACE AND BACK 3/8"

WITH THE FRONT OF THE

1

2

PLACE THE TRACK SQUARE

BOTTOM OF WORKSURFACE

STEP 4

Отзывы: