Solarbayer GmbH
9
MOUNTING INSTRUCTION
High capcity collector PremiumPlan
Special solution:
installing the hanger bolts
These parts are
necessary:
1
st
step:
Define the intervals of the drill
holes according to the dimensi-
ons of the collector. Drill them in
a straight row using a plumb-line
or something comparable.
Drill only on stable structure.
Pre-drill with 10mm, afterwards
use 16mm for these tiles.
hanger bolts
(special equipment)
clamp for support
rail
nut M12
washer
sealing
2
nd
step:
Apply sealing
3
rd
step:
Screw the hanger bolt through
the tiles onto the pre-drilled rafter
as deep as instructed. Fix the
sealing, washer and nut. Adjust
the clamp’s interval by means of
the nut.
4
th
step:
Shift the support rail with the
groove onto the clamp, adjust
and fix it.