background image

Solarbayer GmbH

15

MOUNTING INSTRUCTION

High capcity collector PremiumPlan

3

rd

step:

Shift the upper, hand-tightened
hook downwards until the nib of
the hook clicks into the rail’s
groove. The hook is now fixed
with a 13 mm flat wrench. 

The carrying construction is now
solidly fixed.

2

nd

step:

Telescope the collectors and
tighten with the connection. Do
neither cant nor damage the
sealing.

Caution: 
Do not tighten by force!
Risk of turning the connecting
pipes.

Oberer
Haltebügel

Unterer
Haltebügel

Obere
Alu-Profilschiene

Kollektor

Untere
Alu-Profilschiene

Mounting of the collectors

1

st

step:

Check the intervals of the rails once again and adjust them according
to the rails installation measures before hooking in the collectors. 
Now hook the collector into the lower rail.

collector

lower aluminium 
profile rail

upper aluminium 
profile rail

lower hook

upper hook

Содержание PremiumPlan

Страница 1: ...Solarbayer GmbH 1 Professional solar systems...

Страница 2: ...oks 8 Special solution installing the hanger bolts 9 Special solution mounting with a stand kit 10 Special solution mounting with a flat roof stand kit 11 Installation of horizontal collector rails 12...

Страница 3: ...ably and makes you half way independent of fossil fuels Solar collectors are not only suitable for heating up drinking water but also for the use in heating systems which means that you can also use t...

Страница 4: ...ays wear safety goggles and gloves while working with an angle grinder Flat plate collectors can achieve a stationary temperature of over 200 C due to incident light The risk of burns exists at the co...

Страница 5: ...ing kit basic mounting kit for 2 collec tors intervals between roof hooks standard hooks and plain tile hooks PremiumPlan 2 03 PremiumPlan 2 85 collector height mm 1787 2242 collector width mm 1137 12...

Страница 6: ...ach bolts M 8 washer snap ring nut for fixing the t profile rails wood screws 6x50 mm for fixing the standard hooks on the rafter rail connector coach bolts M 10 washer nut aluminium connection plate...

Страница 7: ...that the stainless steel hook has approx 2 3mm too much play to the roof Now screw the roof hook solidly onto the base plate with a 13mm flat wrench 4th step grind as much material from the tile away...

Страница 8: ...ecial solution installing the plain tile hooks Demount the rafter and screw the base plate with the roof hook onto the rafter This kit can generally be used for most types of tiles that are sea ted so...

Страница 9: ...umb line or something comparable Drill only on stable structure Pre drill with 10mm afterwards use 16mm for these tiles hanger bolts special equipment clamp for support rail nut M12 washer sealing 2nd...

Страница 10: ...ector PremiumPlan Special solution mounting with a stand kit Stand kit for mounting on standard hooks The illustrations show the ready installed base frame on the standard hooks without collector rail...

Страница 11: ...1 72m 1 58m 1 19m distance between rows d 4 71m 5 18m 6 21m weight against wind load kg m collector surface area according to DIN 1055 4 Geb udeh he Ohne Bodenfreiheit Mit Bodenfreiheit 30cm 0 bis 8 m...

Страница 12: ...step Shift the coach bolt into the rail s groove afterwards put the rail onto the roof hook as illustrated on the picture These parts are necessary coach bolts M 10 2nd step Adjust the rail and fix th...

Страница 13: ...e rail connectors 1st step Pre mount the rail connector with coach bolts snap rings and nuts These parts are ne cessary for the rails extension rail connectors if necessary coach bolts M 10 2nd step S...

Страница 14: ...g it to dimen sion and tighten the screws This dimension has to be exactly adjusted because it cannot be changed after the installation This applies to all collectors 3rd step Shift the upper hook wit...

Страница 15: ...th the connection Do neither cant nor damage the sealing Caution Do not tighten by force Risk of turning the connecting pipes Oberer Halteb gel Unterer Halteb gel Obere Alu Profilschiene Kollektor Unt...

Страница 16: ...r s flow and return with the provided connec ting kit Neither cant the threads nor da mage the sealing surface ready installed T joint ready installed elbow joint sensor connection 1st collector flow...

Страница 17: ...spection in regular intervals is recom mended Attention determine bigger dimensions if the pipe lines are longer than 10m 0 10 20 30 40 50 60 70 80 90 100 100 90 80 70 60 50 40 30 20 10 tm ta KELVIN t...

Страница 18: ...least 3 bar close the filling and draining val ves and completely open the flow regulator open the ball valves and put the switching valves if existing the solar system is now ready for operation fill...

Страница 19: ...t always reduce the power stage before throttling the flow rate for electricity saving reasons The regu lator valve stays completely open Adjusting the flow rate recommended minimum flow rate Solarbay...

Страница 20: ...solar systems and their components collectors part 2 test process PrEN 12976 1 thermal solar systems and their components pre fabricated systems part 1 general demands PrEN 12976 2 thermal solar syst...

Страница 21: ...nually Pump is broken Exchange pump Pump is operating but flow and return have the same tempera ture Pump is very hot There is air in the system Valves are closed check system s pressure flush complet...

Страница 22: ...ion diagrams connection according to Tichelmann 6 collectors standard connection special case landscape format ATTENTION The connections are always on top Always uses our horizontal collectors for mou...

Страница 23: ...isting heating system with a Solarbayer boiler and solar system Hot water preparation with solar Solar hot water tank Retrofitting an existing oil gas boiler system with a solar system Further informa...

Страница 24: ...0 84 21 90 39 28 E Mail info solarbayer de www solarbayer de This manual and the pictures and drawings within are protected by the copyright of SOLARBAYER GmbH Technical changes and errors are reserve...

Отзывы: