12
Solarbayer GmbH
MOUNTING INSTRUCTION
High capcity collector PremiumPlan
Installation of horizontal collector rails
1
st
step:
Shift the coach bolt into the rail’s
groove, afterwards put the rail
onto the roof hook as illustrated
on the picture.
These parts are
necessary:
coach bolts
M 10
2
nd
step:
Adjust the rail and fix the coach
bolt with washer, snap ring and
nut.
Use the enclosed rail connectors
for the rails’ extension.
collector carrier rail