|
53
February 2020
|
Solar Stik
®
, Inc.
System Setup and Operation Manual for ATSC MS3 L0
K System Breakdown and Storage
Prior to System breakdown, charge the Expander Paks fully
• Start the generator manually. CTRL>03 Gen Control>ON. Allow the generator to run until the
charging amps drop to 3–4 A, as reported by the LCD User Interface home screen.
• The amount of time required for the charging amps to decrease to this level will be a function of
the Expander Paks state of charge prior to charging.
• Refer to the 24VDC Li Expander Pak Operator Manual in-storage maintenance charging
instructions
.
CTRL
01 AC In Control
Auto Connect
02 CHG Control
Multi-Stage
03 Gen Control
AUTO
Set Gen Control
AUTO
Set Gen Control
ON
Set Gen Control
OFF
P
R
R
1. Turn off the power switches on all components. All circuits must be completely de-energized
before disconnecting components from the Inter-Connect DC or the AC circuits.
2. Disconnect and clean all cables and stow them in the Cable Transport Case. Stow the Solar
Leashes in the Solar Array Transport Case.
3. Disassemble and clean the Solar Arrays. Repacking the Solar Arrays requires careful placement
of the parts in the transport case. Refer to the Operator Manual for the Expedition-C Solar Array
for details.
4. Secure the lids of the PRO-Verter and the Power Hub by fastening the latches.
5. Stow all components securely prior to transport.
WARNING
Solar Arrays produce power when in the sun. Use caution
when disconnecting the Solar Leashes and the panels.
Procedure