SOFAR 7K~10.5KTLM-G3
User manual
Copyright © Shenzhen SOFARSOLAR Co., Ltd
Contents
3.4. Determining the Installation Position..................................................- 15 -
3.5. Moving the SOFAR 7K~10.5KTLM-G3............................................- 17 -
3.6. Installing SOFAR 7K~10.5KTLM-G3............................................... - 18 -
4.2. Connecting PGND Cables...................................................................- 21 -
4.3. Connecting DC Input Power Cables................................................... - 23 -
4.4. Connecting AC Output Power Cables.................................................- 25 -
5.1. Safety inspection before commissioning............................................ - 38 -
8.3. Efficiency,Protection and Communication......................................... - 59 -