3. Installation
Outlines of this chapter
This topic describes how to install the SOFAR 7K~10.5KTLM-G3 .
Installation notes
3.1. Installation Process
Figure 3-1 Installation flowchart
3.2. Checking Before Installation
Checking Outer Packing Materials
Packing materials and components may be damaged during transportation.
Do NOT install the SOFAR 7K~10.5KTLM-G3 on flammable
material.
Do NOT install the SOFAR 7K~10.5KTLM-G3 in an area used to
store Flammable or explosive material.
Danger
The enclosure and heat sink are very hot while the inverter is
working, therefore do NOT install the SOFAR 7K~10.5KTLM-G3 in
places where you might touch them inadvertently.
Caution
Consider the weight of SOFAR 7K~10.5KTLM-G3 when
transporting and moving the inverters.
Choose an appropriate mounting position and surface.
Assign at least two persons to install the inverter.
Attention
Start
Check before
installation
Prepare installation
tools
Determine
installation location
Moving
the
inverter
Install
the
rear
panel
Install
the
inverter
End