24
At the bottom of the page, if the parameter are all ok, selec
t “YES” and press “OK” key for 5s to accept.
6.2. Automatic start
The PV inverter starts automatically when the DC power from the photovoltaic field is sufficient to run only after
the initial startup.
Regulation Parameter
FH D BACK : 50.10Hz
FL D BACK : 49.90Hz
Freq L1 : Disable
Power Reduction:2.4%
Power VS Freq : Enable
Reconnection T : 300s
Yes No
Green backlight
Содержание SUNSYS - B10
Страница 1: ...SUNSYS B10 Installation and Operation Manual ...
Страница 15: ...15 D Check and ensure the device is properly fixed to the bracket in the proper direction ...
Страница 36: ...36 ...
Страница 37: ...37 ...
Страница 38: ...38 ...
Страница 39: ...39 ...
Страница 40: ...40 ...
Страница 41: ...41 ...
Страница 42: ...42 ...
Страница 54: ...54 ...