10
MODULYS GP Green Power 2.0
range from 25 to 200 kVA - Ref.: IOMMODGPXX05-GB 01
3.2-2
Acceptable installation
3.2-1
Correct installation
3.2. CABLE
POSITIONING
WARNING!
The cables must be installed on trays according to the following diagrams. The trays must be positioned near
the UPS.
WARNING!
All metal and suspended ducts or those in raised flooring MUST be connected to earth and to the various cabinets
WARNING!
Power cables and control cables MUST NEVER be installed in the same duct.
WARNING!
Risk of electromagnetic interference between battery cables and output cables.
Common
Mains
Load
N
N
Battery
Control
cables
(1)
Mains
Aux
Mains
N
N
Battery
Load
N
Control
cables
(1)
1. Control cables: connections between the cabinets and each unit, alert signals, remote mimic panel, connection to the BMS
(Building Management System), emergency stop, connection to generator.
Common
Mains
Load
N
N
Battery
≥10 cm
≥10 cm
Control
cables
(1)
≥10 cm
Mains
Aux
Mains
N
N
Battery
Load
N
≥10 cm
≥10 cm
≥10 cm
≥10 cm
Control
cables
(1)
3. ELECTRICAL INSTALLATION