S E C T I O N 5 • I n i t i a l S e t u p a n d D a i l y U s e
Step 3: Install the Convective Warmer
The convective warmer can be placed on a flat surface, mounted to an IV Pole, or mounted to the
Level 1® Convective Warmer cart. See Cart or Pole Clamp Installation and Use Instructions for installing.
Install Power Cord
1. Insert the plug on the power cord into the power cord receptacle (MAINS connection) (
e
) on
the rear of the Convective Warmer.
2. Push the power cord lock (
f
) over the plug to secure it in the receptacle. The indicated lock
feature is spring-loaded and self-locking. The lock must be intentionally pulled back to
release the power cord.
Step 4: Perform Electrical, Functional, and Safety Tests
Perform all applicable electrical, functional, and safety tests as required per institutional procedure.
Electrical safety check must be performed by competent personnel authorized by the institution to
perform such testing. These tests include, but are not limited to: leakage current, ground bond test,
and hipot.
Refer to the
Level 1® Convective Warmer Service Manual
for further information about electrical,
functional, and safety testing. Perform all safety checks on a routine basis according to
institutional policy.