
Level 1®
CONVECTIVE WARMER
| Operator’s Manual
18
S E C T I O N 5 • I n i t i a l S e t u p a n d D a i l y U s e
S E C T I O N 5
Initial Setup and Daily Use
Assembly
The Level 1® Convective Warmer must be assembled and tested by authorized Smiths Medical
personnel, an authorized distributor of Smiths Medical, or competent personnel prior to placing
the convective warmer in service. Read through the instructions completely prior to assembling
the convective warmer.
The following steps describe how to assemble and do preliminary set up of the convective warmer.
Step 1: Unpack the Convective Warmer
1. Check the contents and verify that all components are present. If any parts are missing or
damaged, do not use the convective warmer. Contact Smiths Medical for replacement parts.
Refer to the following list of components that are part of the convective warmer:
•
Level 1® Convective Warmer
•
Operator’s Manual CD
•
Power Cord
•
Hose
•
Sheet Clip Assembly
•
Cord Wrap
Note:
The Power Cord and Cord Wrap are packaged separately from the Warmer.
Note:
After unpacking all the contents, please recycle packaging material according to
hospital policy for recyclable materials.