
- 34 -
6.4 Parallel I/O Wiring Example
When you connect a PLC, etc. to the CN5 parallel I/O connector, please use the I/O cable (LEC-CN5-
□).
The wiring should be changed depending on the type of the parallel I/O (NPN or PNP).
Please wire referring to the following diagram.
●
NPN type
●
PNP type
Caution
The 24 VDC controller power supply for CN1 and the 24V DC I/O power supply for CN5 should be
separated.
Load
B12
*ESTOP
B13
*ALARM
B11
SVRE
B10
INP
B9
SETON
B8
AREA
B7
BUSY
B6
OUT5
B5
OUT4
B4
OUT3
B3
OUT2
B2
OUT1
B1
OUT0
A13
SVON
A12
RESET
A11
DRIVE
A10
HOLD
A9
SETUP
A8
IN5
A7
IN4
A6
IN3
A5
IN2
A4
IN1
A3
IN0
A2
COM
-
A1
COM
+
CN5
I/O signal power
24 VDC
Load
Load
Load
Load
Load
Load
Load
Load
Load
Load
Load
Load
B12
*ESTOP
B13
*ALARM
B11
SVRE
B10
INP
B9
SETON
B8
AREA
B7
BUSY
B6
OUT5
B5
OUT4
B4
OUT3
B3
OUT2
B2
OUT1
B1
OUT0
A13
SVON
A12
RESET
A11
DRIVE
A10
HOLD
A9
SETUP
A8
IN5
A7
IN4
A6
IN3
A5
IN2
A4
IN1
A3
IN0
A2
COM
-
A1
COM
+
CN5
Load
Load
Load
Load
Load
Load
Load
Load
Load
Load
Load
Load
Load
I/O signal power
24 VDC