HRX-OM-R026
Chapter 4 Starting the Product
HRSH Series
4.1
Before Starting
4-1
Chapter 4 Starting the Product
4.1 Before Starting
Check the following items before starting the product.
Installation conditions
Check the product is installed horizontally.
Check that there are no heavy objects on the product, and the external
piping is not applying excessive force to the product.
Connection of cables
Check the power, ground and communications (optional) cables are
correctly connected.
Circulating fluid
Check proper connection of piping at inlet and outlet.
Fluid level gauge
Ensure that the fluid level is on “H”.
Facility water piping
(For water cooled type)
Check proper connection of piping at the facility water inlet and outlet.
Check that the facility water source is in operation.
Check that the facility water circuit is not shut off by valves.
【
Tips
】
In case of water cooled type, it has water regulation valve in facility water
circuit. Facility water might not flow if this product stopping.
Only people who have sufficient knowledge and experience about the
product and its accessories are allowed to start and stop the product.
Supply facility water within the specified
”.
Содержание HRSH090-A
Страница 8: ...HRX OM R026 Contents HRSH Series ...
Страница 20: ...HRX OM R026 Chapter 2 Name and Function of Parts 2 4 Operation display panel HRSH Series 2 6 ...
Страница 52: ...HRX OM R026 Chapter 3 Transport and Setting Up 3 6 Option J Piping of Automatic fluid filling HRSH Series 3 32 ...
Страница 62: ...HRX OM R026 Chapter 4 Starting the Product 4 6 Adjustment of Circulating Fluid flow rate HRSH Series 4 10 ...
Страница 146: ...HRX OM R026 Chapter 5 Display and setting of various functions 5 21 Communication function HRSH Series 5 84 ...
Страница 170: ...HRX OM R026 Chapter 8 Control Inspection and Cleaning 8 4 Stop for a Long Time HRSH Series 8 10 ...
Страница 188: ...HRX OM R026 Chapter 9 Documents 9 8 Daily Check Sheet HRSH Series 9 18 ...
Страница 191: ......